Saturday, June 27, 2009
A Productive Week
This week the team was able to do two days of pool testing which helped us to identify a couple of areas in the control code where we could optimize and improve the overall vehicle performance. Our mission devices have all been designed and we are waiting for a few of the last pieces to arrive before we attach them to the vehicle.
The vehicle's cameras are currently being trained to the competition elements that we constructed. (More Pictures of those photo album on the right side)
Here are a few of the pictures from the testing this week.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment